Chi phí xây dựng
Quote from bsdinsight on 12 November 2023, 11:24Tài liệu cung cấp các chi phí xây dựng chuẩn, trung bình ở các quốc gia như Singapore, Hongkong, Nhật bản, Hàn quốc, … và Việt nam. Tài liệu này được Cushman & Wakefield – và tài liệu này bạn có thể download tại đây
Asia Pacific is attractive to investors for its comparatively low land and development costs and for the growth potential in both developed and emerging markets.
Although supply chain disruption and supply/demand imbalances for both labour and materials remain in recovery, raw material prices, energy and transport costs remain at an all-time high and continue to contribute towards record construction costs. Overall, the market has seen an average increase of 4.9% on 2022 construction pricing.
Regional Land Cost Index – Top 5 Markets
An increasing scarcity of suitable land parcels with available power in some markets, combined with higher borrowing costs in most markets, have contributed to cost increases. The top 5 most expensive markets for land cost are:
- Singapore
- Hàn Quốc
- Nhật
- Hongkong và Trung Quốc
- Trung quốc
Regional Construction Cost Index – Top 5 Markets
With year-on-year increases of between 8% in Singapore and 3.5% in Australia, the top 5 most expensive markets for construction cost are:
- Nhật
- Singapore
- Hàn quốc
- Trung quốc
- Úc
Bạn đọc và tải tài liệu tại đây
[dflip id="95944"][/dflip]
Tài liệu cung cấp các chi phí xây dựng chuẩn, trung bình ở các quốc gia như Singapore, Hongkong, Nhật bản, Hàn quốc, … và Việt nam. Tài liệu này được Cushman & Wakefield – và tài liệu này bạn có thể download tại đây
Asia Pacific is attractive to investors for its comparatively low land and development costs and for the growth potential in both developed and emerging markets.
Although supply chain disruption and supply/demand imbalances for both labour and materials remain in recovery, raw material prices, energy and transport costs remain at an all-time high and continue to contribute towards record construction costs. Overall, the market has seen an average increase of 4.9% on 2022 construction pricing.
Regional Land Cost Index – Top 5 Markets
An increasing scarcity of suitable land parcels with available power in some markets, combined with higher borrowing costs in most markets, have contributed to cost increases. The top 5 most expensive markets for land cost are:
- Singapore
- Hàn Quốc
- Nhật
- Hongkong và Trung Quốc
- Trung quốc
Regional Construction Cost Index – Top 5 Markets
With year-on-year increases of between 8% in Singapore and 3.5% in Australia, the top 5 most expensive markets for construction cost are:
- Nhật
- Singapore
- Hàn quốc
- Trung quốc
- Úc
Bạn đọc và tải tài liệu tại đây